书名:Copper Mine Project Profiles 2014
出版时间:2014
出版社:CRU International Ltd.
摘要
Copper mine output is set to grow strongly during 2015-2016 as a wave of committed projects is due on stream, after which production will become more and more dependent on uncommitted projects. By the late 2020s, growth will dependent on early stage projects and new exploration.
The bulk of new Tier 1 and Tier 2 capacity will be commissioned in the period 2015-2020, with more than 65% of planned production expected on stream by 2022.
Projects continue to suffer from delays, with early stage projects the most at risk.
The longest delays are being seen in the Americas, with environmental and social issues being important in these regions.
查看更多
目录
Chapter 1
Executive Summary & Analysis Section 1-1
Executive Summary 1-2
1. Production Forecasts 1-7
2. Project Rankings 1-16
3. Regional Analysis1-27 1-24
4. Technical Analysis 1-31
5. Ownership Analysis 1-39
6. Financial Analysis 1-42
Chapter 2
Tier 1 Project Profiles
AFRICA
Haib - Namibia 2-1
Kamoa (Phase 1) 2-3
Kamoa (Phase 2) 2-5
Luita (Sulphide) Expansion 2-7
Lumwana Expansion 2-9
RTR (Kolwezi) 2-11
Sentinel (Trident) 2-13
ASIA
Aktogay (Concs) 2-15
Aktogay (SXEW) 2-17
Aynak 2-19
Bozshakol 2-21
Grasberg Block Cave 2-23
Grasberg DMLZ 2-25
Grasberg Kucing Liar 2-27
Gyama Phase 2 2-29
Jabal Sayid 2-31
Oyu Tolgoi Phase 2 2-33
Pulang 2-35
Reko Diq (Concs) 2-37
Reko Diq (SXEW) 2-39
Tampakan 2-41
Xietongmen-Xiongcun 2-43
AUSTRALASIA
Carrapateena 2-45
Frieda River 2-47
Hillside 2-49
Namosi 2-51
Panguna/Bougainville 2-53
Solwara 2-55
Wafi-Golpu 2-57
Yandera 2-59
EUROPE
Ak-Sug 2-6
Peschanka 2-63
Tominskoye 2-65
Udokan 2-67
NORTH AMERICA
Ann Mason 2-69
Buenavista (New Concentrator) 2-71
Casino (Concs) 2-73
Casino (heap leach) 2-75
El Arco (Concs) 2-77
El Arco (SXEW) 2-79
Galore Creek 2-81
Pebble 2-83
Pumpkin Hollow (open pit) 2-85
Resolution Copper 2-87
Rosemont Ranch (Concs) 2-89
Rosemont Ranch (SXEW) 2-91
Schaft Creek 2-93
Twin Metals Project 2-95
SOUTH AMERICA
Agua Rica 2-97
Alemao 2-99
Altar 2-101
Andina Expansion (Phase II) 2-103
Antucoya 2-105
Canariaco Norte 2-107
Centinela District Development 2-109
Cerro Casale (Aldebaran) 2-111
Cerro Verde Expansion (Concs) 2-113
Chuquicamata Underground 2-115
Cobre Panama (Petaquilla) 2-117
Collahuasi Expansion 2-119
Constancia 2-121
Cristalino 2-123
El Galeno 2-125
El Morro 2-127
El Pachon 2-129
El Teniente (New Mining Level) 2-131
Escondida OGP1 2-133
Haquira (Concs) 2-135
Haquira (SXEW) 2-137
La Granja 2-139
Las Bambas 2-141
Los Azules 2-143
Los Calatos 2-145
Los Chancas 2-147
Los Helados 2-149
Los Pelambres Expansion 2-151
Los Sulfatos 2-153
Michiquillay 2-155
Mina Justa-Marcona (Concs) 2-157
Mina Justa-Marcona (SXEW) 2-159
Minas Conga 2-161
Mirador 2-163
Panantza San Carlos - Ecuador 2-165
Productora - Chile 2-167
Quebrada Blanca Sulphides 2-169
Quellaveco 2-171
Radomiro Tomic Sulphides II 2-173
Rajo Inca 2-175
Relincho (Concs) 2-177
Rio Blanco 2-179
Salobo III 2-181
San Enrique Monolito 2-183
Santo Domingo 2-185
Spence (Sulphides) 2-187
Taca Taca Phase 1 2-189
Taca Taca Phase 2 2-191
Tia Maria 2-193
Toquepala Expansion 2-195
Vizcachitas 2-197
Zafranal (Concs) 2-199
Zaldivar Sulphides 2-201
Chapter 3
Tier 2 Project Profiles
Afton-Ajax 3-1
Águila 3-1
Ajo Re-start 3-1
Alicia 3-1
Andacollo - sulphides expansion 3-2
Antakori 3-2
Antilla 3-2
Bagdad Expansion (Concs) 3-2
Bahuerachi 3-3
Balkhab 3-3
Basay 3-3
Berg 3-3
Beutong 3-4
Boa Esperanca 3-4
Boleo 3-4
Bystrinskoye 3-4
Catface 3-5
Cerro Colorado - Sulphides (Chile) 3-5
Chambishi Southeast 3-5
Chapi Sulphides 3-5
Chaucha 3-6
Chingola Refractory Ore Project 3-6
Cobre Panama Expansion 3-6
Cochise-Bisbee 3-6
Comide 3-7
Copper Creek 3-7
Coroccohuayco 3-7
Cotabambas 3-7
Cuajone Expansion - Stage 3 3-8
Cuatro Hermanos 3-8
Diego de Almagro (Conc) 3-8
Duobaoshan Phase II 3-8
El Abra Sulphides 3-9
El Espino 3-9
El Pilar 3-9
El Teniente - NML expansion 3-9
Encuentro Oxides 3-10
Far Southeast 3-10
Fishtie (Kashime) 3-10
Gabriela Mistral - Sulphides 3-10
Gaworzyce-Radwanice 3-11
Ghanzi 3-11
Granduc 3-11
Grodziecka Syncline 3-11
Gunnison 3-12
Harper Creek 3-12
HCL - (Malanjkhand) Expansion phase 1 3-12
Hinoba'an 3-12
Hushamu (North Island Project) 3-13
Ichimpe 3-13
Inca de Oro 3-13
Junin 3-13
Kakanda 3-14
Kakanda Tailings 3-14
Kalkaroo 3-14
Kamoto-KOV - Phase 5 3-14
Kangaluwi (SXEW) 3-15
Kangeshi 3-15
Kansanshi Expansion Phase III 3-15
Kerr-Sulphurets-Mitchell (KSM) 3-15
King-king (Concs) 3-16
King-king (SXEW) 3-16
Kipoi - Stage II 3-16
Kipushi 3-16
La Granja Mill 3-17
La Verde 3-17
Laver 3-17
Letra Rumi South 3-17
Little Eva 3-18
Llahuin 3-18
Lomas Bayas III 3-18
Lone Star 3-18
Lonshi Underground 3-19
Los Mantos 3-19
Lubambe Phase 2 3-19
Lubembe 3-19
Magistral 3-20
Mankayan-Guinaoang 3-20
Mantoverde Sulphide 3-20
Marsden 3-20
Maslovskoye 3-21
Miduk Expansion 3-21
Mocoa 3-21
Mokambo 3-21
Monywa/Letpadaung 3-22
Morenci Expansion 2 (Concs) 3-22
Morrison 3-22
Mumbwa 3-22
Mutanda concentrator 3-23
New Prosperity 3-23
NICICO Miscellaneous greenfield 3-23
Nkana Synclinorium Shaft 3-23
Northmet (Concs) 3-24
Ok Tedi open pit extension 3-24
Ok Tedi Underground 3-24
Olympic Dam Expansion - Stage 2 3-24
Olympic Dam Expansion - Stage 5 3-25
Olympic Dam Expansion - Stages 3 & 4 3-25
Ordubad 3-25
Oyu Tolgoi Phase 3 Hugo South/Herruga 3-25
Palabora Lift II 3-26
Pecobre 3-26
Pilares 3-26
Pinto Valley Extension 3-26
Poplar 3-27
Project 118 3-27
Proyecto de Rio Tinto Restart 3-27
Pukaqaqa 3-27
Quechua 3-28
Ray Expansion (SXEW) 3-28
Red Chris 3-28
Redstone 3-28
Retków-Scinawa 3-29
Rocklands 3-29
Safford – Sulphides 3-29
San Manuel Restart (SXEW) 3-29
San Nicolas Restart 3-30
Sarcheshmeh Expansion Phase 3 3-30
Serrote da Laje 3-30
Shakardara 3-30
Shituru 3-31
Sicomines 3-31
Sierra Gorda (SXEW) 3-31
Silangan-Boyongan 3-31
Simuku 3-32
Sungun Expansion Phase 2 3-32
Sungun Expansion Phase 3 3-32
SW Tintic 3-32
Taysan 3-33
Tenke Fungurume – Sulphides 3-33
Timok 3-33
Tohono (Concs) 3-33
Tohono (SXEW) 3-34
Tominskoye phase 2 3-34
Toqui Cluster 3-34
Toromocho Expansion 3-34
Tovaku 3-35
Trapiche 3-35
Tsagaan Suvarga 3-35
Tujuh Bukit 3-35
Upper Kobuk Mineral Projects 3-36
Vicuna-Josemaria 3-36
West Jerome 3-36
West Wall 3-36
Wunugetu - Stage 3 3-37
Yangla Expansion 3-37
Yulong Phase II 3-37
Chapter 4 4-1
1. Introduction 4-1
1.1 Types of project profiles 4-1
1.1.1 Tier 1 project profiles 3.1
1.1.2 Tier 2 project profiles 3.2
2. Individual project profiles 4-3
2.1 What defines a project? 4-3
2.2 Information sources 4-3
2.3 General information 4-4
2.4 Annual production rates and concentrate specifications 4-5
2.5 Ore reserves and resources 4-6
2.6 Cost data 4-7
2.6.1 CRU Copper Cost Model 4-7
2.6.2 CRU Vale Based Costing (VBC) 4-8
2.6.3 CRU Normal Costing 4-9
2.6.4 Capital requirements 4-10
2.7 Development 4-11
查看PDF
查看更多
馆藏单位
冶金工业信息标准研究院